8. The fees for an application for authorization or modification of authorization for a groundwater catchment project under section 31 of the Groundwater Catchment Regulation (chapter Q-2, r. 6) are as follows:(1) for a groundwater catchment project supplying more than 20 persons and having a capacity of less than 75 m3 per day: $1,687; (2) for a groundwater catchment project having a capacity of 75 m3 but not more than 300 m3 per day or that will increase the capacity to 75 m3 or more per day without exceeding 300 m3: $1,687; (3) for a groundwater catchment project having a capacity of more than 300 m3 per day: $4,496; or (4) for a groundwater catchment project if the water is to be distributed or sold as spring water or mineral water or to be used as an ingredient in the fabrication, conservation or treatment and listed as spring water or mineral water on a product within the meaning of the Food Products Act (chapter P-29) or on the package, container or label of such a product: $3,936. The renewal of the authorizations referred to in section 38 of the Groundwater Catchment Regulation is subject to payment of fees representing 10% of the fees payable under the first paragraph. However, if there is a change in the conditions of operation, the fees payable are those provided for in the first paragraph.